Outline
All works are completed in a factory, such as fabricating panels, installing a refrigerating machine, piping, light and cabling.
Heat insulation panel colies with the requirements of USPH.
Major Features
Before installing on board, the two units are combined. the units are installed on board at once.
Only connecting pipes and cables are required.
Less working on board.
High quality level.
A ref. prov. machine base and lamps can be installed in the factory. They were previously installed in the shipyard.